OPERATIONAL RECORD

MISSIONS

A record of UAV deployments. Each mission represents a problem solved, a risk removed and data delivered.

Aerial view of quarry from above, dark atmospheric overcast sky, deep shadows on rocky terrain
MISSION 024LiDAR

53.763° N / 2.704° WLANCASHIRE

Quarry Volumetric LiDAR Survey

THE OBJECTIVE

Accurate stockpile measurement across 14-hectare active quarry without operational shutdown.

THE CHALLENGE

Active quarry operations with HGV movements and dust. Survey required without stopping production.

THE OUTCOME

Survey completed in 4 hours flight time. Stockpile volumes calculated to ±0.3% accuracy. Production continued uninterrupted.

DATA

2.4 billion LiDAR points captured. 14 individual stockpiles identified and modelled.

Industrial infrastructure inspection, dark atmospheric environment with deep shadows, moody industrial lighting
MISSION 019CONFINED SPACE

53.521° N / 2.118° WGREATER MANCHESTER

Water Treatment Tank Internal Inspection

THE OBJECTIVE

Internal inspection of three reinforced concrete tanks without confined-space entry.

THE CHALLENGE

Tanks previously required full confined-space entry team. High cost and programme risk.

THE OUTCOME

Full internal survey completed. Structural defects identified and mapped. Zero personnel entry required. 70% cost saving versus traditional access.

DATA

4K video and high-resolution imagery captured throughout. Defects mapped to tank drawings.

Abstract thermal heat map visualization, dark atmospheric background with glowing heat signatures
MISSION 031THERMAL

53.801° N / 2.987° WLANCASHIRE COAST

Coastal Flood Defence Thermal Survey

THE OBJECTIVE

Thermal anomaly detection across 2.3km of coastal flood defence infrastructure.

THE CHALLENGE

Linear asset inaccessible by vehicle. Traditional inspection would require specialist access equipment over multiple days.

THE OUTCOME

7 thermal anomalies identified. Maintenance prioritised by severity. No access disruption. Survey completed in one day.

DATA

Radiometric thermal imagery processed. Temperature anomalies identified, classified and geolocated.

Industrial chimney or tower structure inspection, dark atmospheric environment, moody industrial lighting
MISSION 027INSPECTION

53.644° N / 2.345° WLANCASHIRE

Industrial Chimney Stack Inspection

THE OBJECTIVE

Full external inspection of 85m chimney stack without scaffolding or rope access.

THE CHALLENGE

Chimney in active service. Scaffolding would require operational shutdown and 6-week programme.

THE OUTCOME

Full inspection completed in one day. Spalling and repointing requirements identified and mapped. Asset remained in service throughout.

DATA

Thousands of high-resolution images captured and processed into photogrammetric model.

Aerial view of construction site from above, dark moody overcast sky, low-key industrial lighting
MISSION 033MAPPING

54.012° N / 2.534° WNORTH LANCASHIRE

Pre-Construction Topographical Survey

THE OBJECTIVE

Survey-grade topographical data for 47-hectare development site.

THE CHALLENGE

Uneven terrain with active drainage channels. Traditional survey estimated at 3 weeks for site team.

THE OUTCOME

Survey data delivered within 5 working days. Directly imported into AutoCAD Civil 3D for design team. 3-week programme reduced to 5 days.

DATA

Survey-grade DTM, DSM and orthomosaic produced. Accuracy verified against GCPs to ±2cm.

Infrastructure inspection aerial view, dark atmospheric environment with deep shadows, technical overlay
MISSION 016INFRASTRUCTURE

53.489° N / 2.241° WGREATER MANCHESTER

Railway Viaduct Structural Inspection

THE OBJECTIVE

Visual inspection of 14-span Victorian railway viaduct including soffits and piers.

THE CHALLENGE

Active railway. Possession windows limited to 4-hour overnight slots. Access beneath arches restricted.

THE OUTCOME

All 14 spans fully inspected within three possession windows. Defect schedule produced. Network Rail compliant reporting delivered.

DATA

6,000+ high-resolution images captured. Photogrammetric model of complete structure produced.